The San Marcos Wind Farm is located 140 kilometres south of the capital of Tegucigalpa (Honduras), near the border with Nicaragua. This wind project will generate 50 MW of clean energy and includes the installation of 25 Gamesa G9 wind turbines, which will supply the energy demand of approximately 100,000 households, equivalent to the energy supply for about 500,000 people.

The owner of the wind farm, Grupo Terra, is the largest private operator of energy projects in Central America. Based in Tegucigalpa, the company has extensive experience in the construction, operation, maintenance, and repair of both renewable and thermal energy projects. Delvalle's commitment to renewable energies has resulted in new systems specifically adapted to customer needs and which are environmentally friendly.

 

SOLUTION PROPOSED BY THE DELVALLE ENGINEERING TEAM

Whenever we are faced with installations in a booming sector, such as renewable energies, we work closely with our customers on a case-by-case basis, enabling us to design the ideal weatherproof equipment at an unbeatable price: our Luxor Series electrical enclosure made of galvanised steel and painted in RAL 7032. These cabinets have been designed to protect the electrical components at high altitude and humidity and against adverse weather conditions such as rain, snow, wind, etc.... They guarantee sealing against dust and water, high corrosion resistance, and durability superior to any other reinforced polyester enclosure.

19
South Africa
Implementation of 19" Stainless Steel Electrical Racks for Mines in South Africa...
Outdoor Enclosures Low Emission Zones · Delvalle Box
Spain
The Challenge: Ensuring Reliability in Low Emission Zones (LEZ)...
Port of Barcelona · Delvalle Box
Spain
To measure particles in environments contaminated by chlorinated hydrocarbons (HCH) in the Port of...