The new transmission system Milagro - Babahoyo doubles the transmission capacity of the existing infrastructure in this important area of the country, with this new construction of Milagros-Babahoyo transmission line, a 42 km long double circuit and the expansion of 2 bays of 138 kV and a 69 kV bay in the Babahoyo substation, complemented by the expansion of a 138 kV bay in the Milagro substation.

 

SOLUTION BY DELVALLE ENGINEERING TEAM

Fot this case, we proposed our Galvanizes steel outdoor enclsoure, Storm Series and Luxor Series, both of them designed to be placed in outdoor facilities and protecting the internal compontents to ensure the lighting, road signs and video surveillance.

 

19
South Africa
Implementation of 19" Stainless Steel Electrical Racks for Mines in South Africa...
Outdoor Enclosures Low Emission Zones · Delvalle Box
Spain
The Challenge: Ensuring Reliability in Low Emission Zones (LEZ)...
Port of Barcelona · Delvalle Box
Spain
To measure particles in environments contaminated by chlorinated hydrocarbons (HCH) in the Port of...