Endesa has embarked on an ambitious wind farm implementation plan in the province of Aragón (Spain); with an investment of over 425 million euros in 13 wind farms, it is one of the major projects of the decade, aiming to deploy a total capacity of 413 megawatts (MW).

After successfully completing the administrative processing phase to develop the 13 plants in the provinces of Zaragoza and Teruel, with an estimated production of 1,400 gigawatts per hour per year, (an amount equivalent to the annual consumption of 350,000 families), these plants require outdoor coverage so that the installation is protected against the elements at all times. It is in adverse weather conditions that the technical and technological capacity of an electrical cabinet really comes into its own.

 

SOLUTION BY DELVALE ENGINEERING TEAM

This type of installation must ensure the durability, resistance and suitable service life of the mechanisms and automatisms contained within the enclosure. One solution which has more than proven itself over the years in our company's experience is the Luxor Series galvanised, a model which can be customised to the specific needs of each workspace. In addition, it can also be supplied in stainless steel; an improvement which is more than evident

19
South Africa
Implementation of 19" Stainless Steel Electrical Racks for Mines in South Africa...
Outdoor Enclosures Low Emission Zones · Delvalle Box
Spain
The Challenge: Ensuring Reliability in Low Emission Zones (LEZ)...
Port of Barcelona · Delvalle Box
Spain
To measure particles in environments contaminated by chlorinated hydrocarbons (HCH) in the Port of...