The first wind farm in the north of the Dominican Republic has been commissioned, located in Agua Clara, in the province of Montecristi, it will help revitalise the local economy and generate 50 GWh/year; enough energy to supply more than 250,000 people. Comprising 25 turbines, each with a capacity of 2 GWh/year, it is an interesting boost to the economic activity of the area and a first step towards focusing the country's efforts on the creation and generation of a green economy.

The development plans for this facility are to gradually increase production with the incorporation of new turbines until it reaches three times its current size.

 

SOLUTION BY DELVALE ENGINEERING TEAM

The ambitious development plan behind it means that one of the requirements is to ensure installation scalability, that all the electrical cabinets are compatible, that they are not discontinued in manufacture and that they offer the maximum assurance, for this reason the proposal was to incorporate the Luxor Series galvanized enclosure, which has a high degree of exposure to a climatic zone with thermal changes, which allows it to have a service life of well over 10 years; an investment aimed at the long term.

19
South Africa
Implementation of 19" Stainless Steel Electrical Racks for Mines in South Africa...
Outdoor Enclosures Low Emission Zones · Delvalle Box
Spain
The Challenge: Ensuring Reliability in Low Emission Zones (LEZ)...
Port of Barcelona · Delvalle Box
Spain
To measure particles in environments contaminated by chlorinated hydrocarbons (HCH) in the Port of...